|
Monday, November 05, 2007 |
|
(Internal release)
The first offloading of oil from the FPSO Sevan Piranema has been successfully completed. The oil was offloaded to the shuttle tanker Navion Bergen. The FPSO Sevan Piranema commenced oil production on October 11, 2007, on the Piranema field off the north-east coast of Brazil.
|