An important milestone was reached in August 2009 when FPSO Sevan Voyageur commenced production on the Shelley field in the Central UK North Sea. Following an efficient and successful start-up of the production plant, the unit delivered an average Technical Uptime for fourth quarter of 2009 of 98.3%.
FPSO Sevan Voyageur has continued to demonstrate the suitability of the Sevan design for operations in harsh environments and at the end of 2009 it had achieved 398 days at sea without any lost time incidents.
The FPSO departed the Shelley field in August 2010 and is currently located at the Nymo yard in Arendal, Norway, where the upgrade work required for Huntington operation is ongoing.
FPSO Sevan Voyageur is contracted to E under a fixed term of five years with extension options for operations on the Huntington field in the UK North Sea.
|
|
|
|
|
|
Key Data:
|
|
|
| Design: |
|
Sevan 300 |
| Building year: |
|
2007-2008 |
| Yards: |
|
Yantai Raffels (hull) |
|
|
Keppel Verolme (topside integration) Nymo (gas compression plant) |
| Client: |
|
E.ON Ruhrgas UK E&P |
| Contract: |
|
5 years fixed plus extension options |
| Field: |
|
Huntington field, UK North Sea |
| Water depth: |
|
120 m |
| Field application: |
|
Oil production, Gas export and water injection |
| Production startup: |
|
EQ1-12 |
|
|
|
Techical data:
|
|
|
| Overall length: |
|
66 m |
| Diam. in waterline: |
|
60 m |
Displacement at 18m draft: |
|
55,000 mT |
| Deck area capacity: |
|
5,000 mT |
| Deck area: |
|
3,200 m2 |
| Accommodation: |
|
54 persons |
| Mooring: |
|
12 lines (anchor-chain-polyester-chain) |
| Riser slots: |
|
10 |
| Liquid production: |
|
30,000 bbl/day |
Crude storage capacity: |
|
270,000 bbls/43,000 m3 |
Export to shuttle tanker: |
|
3,600 m3/h |
|
|
|
|
|
|
|
|