• Sevan
  • Sevan
  • Sevan
 
 

081202 voyageur_lowAn important milestone was reached in August 2009 when FPSO Sevan Voyageur commenced production on the Shelley field in the Central UK North Sea. Following an efficient and successful start-up of the production plant, the unit delivered an average Technical Uptime for fourth quarter of 2009 of 98.3%.

FPSO Sevan Voyageur has continued to demonstrate the suitability of the Sevan design for operations in harsh environments and at the end of 2009 it had achieved 398 days at sea without any lost time incidents.

The FPSO departed the Shelley field in August 2010 and is currently located at the Nymo yard in Arendal, Norway, where the upgrade work required for Huntington operation is ongoing.

FPSO Sevan Voyageur is contracted to E under a fixed term of five years with extension options for operations on the Huntington field in the UK North Sea.

 

 

 

    

Key Data:

Design: Sevan 300
Building year: 2007-2008
Yards: Yantai Raffels (hull)
Keppel Verolme (topside integration)
Nymo (gas compression plant)
Client: E.ON Ruhrgas UK E&P
Contract: 5 years fixed plus extension options
Field: Huntington field, UK North Sea
Water depth: 120 m
Field application: Oil production, Gas export
and water injection
Production startup: EQ1-12

Techical data:

Overall length: 66 m
Diam. in waterline: 60 m
Displacement at
18m draft:
55,000 mT
Deck area capacity: 5,000 mT
Deck area: 3,200 m2
Accommodation: 54 persons
Mooring: 12 lines
(anchor-chain-polyester-chain)
Riser slots: 10
Liquid production: 30,000 bbl/day
Crude storage
capacity:
270,000 bbls/43,000 m3
Export to
shuttle tanker:
3,600 m3/h