Piranema Spirit

 

070608_Sevan300pirjune02.jpgPiranema Spirit has performed with consistently high Unit Uptime levels since its start up in October 2007. At end of 2009, the unit has performed at an average of 99.8% Unit Uptime over the last 7 months and with no lost time incidents over the same period.

The unit, which was the first cylindrical FPSO ever to commence operations, is operating for Petrobras S.A. on the Piranema field, located in the deep waters of the Brazilian state of Sergipe. Installed at a 1,100 m water depth, the Piranema Spirit is currently interconnected to six wells; three producing wells, and three gas injection wells. Current daily production levels are approximately 8,000 bbls of produced oil and 800,000 m3 of gas re-injection. The connection of another four wells will be carried out in 2010/11. Subsequent daily production levels are expected to increase substantially.

At the end of 2009, the FPSO Piranema Spirit's accumulated production reached 6.0 million barrels of petroleum. 30 off­loading operations to export tanker had been carried out; all of which with a high level of efficiency.

The unit is operating under an 11+5 year charter contract with Petrobras S.A. 

Petrobras S.A is a national oil company founded in 1953 by the Brazilian government. Petrobras has been ranked as the world's 3rd largest public energy company and 8th largest company in the world in market value, and closed 2010 with a production of 2.2 million bpd of oil and LNG and 0.4 million boepd of gas.

iso 9001_2000 pir.jpg iso 14001_2004 pir.jpg

ohsas 18001_2007 pir.jpg

 ISO 9001:2000

 ISO 14001:2004

 OHSAS 18001:2007

Key Data:

Design: Sevan 300
Building year: 2006-2007
Yards: Yantai Raffels (hull)
Keppel Verolme (topside integration)
Owner: Teekay Petrojarl AS
Operator: Petrobras S.A.
Contract: 11 year fixed + 5 year option
Field: Piranema, Sergipe state, Brazil
Water depth: 1,000 m phase I
1,600 m phase II
Field application: Oil production and gas reinjection
Production startup: October 2007

Techical data:

Overall length: 66 m
Diam. in waterline: 60 m
Displacement at 18m draft: 55,000 mT
Deck area capacity: 5,000 mT
Deck area: 2,800 m2
Accommodation: 63 persons
Mooring: 9 lines (anchor-chain-polyester-chain)
Riser slots: 25
Liquid production: 30,000 bbl/day
Gas reinjection capacity: 3.6 mSm3/d
@ 285 bar (3 x 50% compressors)
Crude storage capacity: 250,000 bbls/40,000 m3
Export to shuttle tanker: 1,800 m3/h

Images:

070608_Sevan300pirjune02 jr beiramar a100 - 01 e 02-11-07 piranema 481_low
The Piranema Spirit on the Piranema Field Offloading from Piranema Spirit